Projects
Upcoming projects
- Reassignment of Tube lines — If tube lines were not built sequentially as required by the need at that point in time; given the current stations and travel demand, what is an optimal redistribution of lines.
- Traffic impact of pedestrianisation of Oxford street — An agentic approach to how much the pedestrianisation of Oxford street would actually impact the congestion in the surrounding area. Furthermore, the same technique could be applied to investigating how the introduction of cycle lanes impacts traffic.
- Graph theory application in Jiu-Jitsu — Each position in Jiu-Jitsu can be regarded as a node on a Graph, with the connecting directional edges representing the difficult of transitioning two positions somewhat like a hopping probability. Theortically, the shortest/most probable path to a submission/advantage can be calculated.
- Node approach to chess analysis. - Inspired by a video from mathematics youtube channel 2swap about solving Connect 4 by representing each game state as a node, is it possible to build a relaxed chess engine that chooses the optimal possible path , reversing from existing chess engines.
Projects
-
Tube Line optimisation
Refer to first upcoming project, WIP